Shackleton Heights

Shackleton Heights

Main Contractor: Speller Metcalfe
Client: Abri
Products: Classic wall system
Units: 49
Location: Lockleaze, Bristol

About the Project

The Hereford-based timber frame manufacturer was appointed by main contractor Speller Metcalfe on the known quality of its services and competitive rate.

Timber frame was the build method of choice for the houses on the site and brick and block work was implemented on the traditional flats.

Chloe Burke, senior quantity surveyor at Speller Metcalfe commented:

“Timber frame is a quicker construction method than building the houses from traditional masonry.  It also allows us to achieve greater air tightness for SAPS and Building Regulations.”